Process identification and clustering for transparency in reorganising public administrations (PICTURE)

Basic data for this project

Type of projectEU-project hosted outside University of Münster
Duration at the University of Münster01/02/2006 - 31/01/2009

Description

Information Technology is no end in itself - it has to be accepted by its users to generate a serious advantage for an organization. It is mandatory to communicate the advantages in a transparent way. Especially in public administrations the complexity of the visualized processes is so high that the uncertainty about ICT-investments leads to no actual investment. The objective of the PICTURE project therefore was the development of a holistic method that allows a description of the process landscape and the identification of reorganization potentials in public administrations. That included the development of re-usable model building blocks, identification of generic ICT-functionalities, development of an evaluation component and a modeling tool to use the developed building blocks in practice.

KeywordsBusiness Process Modelling; Business Process Management; E-Government
Website of the projecthttp://www.picture-eu.org
Funding identifier27717
Funder / funding scheme
  • EC FP 6 - Specific Targeted Research Projects (STREP)

Project management at the University of Münster

Becker, Jörg

Applicants from the University of Münster

Becker, Jörg

Research associates from the University of Münster

Algermissen, Lars
Falk, Thorsten
Räckers, Michael

Project partners outside the University of Münster

  • City of MünsterGermany
  • CSI PiemonteItaly
  • University of St. Gallen (HSG)Switzerland
  • Filenet Limited (FILENET LIMITED)United Kingdom
  • Stadt WinterthurSwitzerland
  • Citta Di TorinoItaly
  • Municipal Technology Company of Amaroussion (DETDA)Greece
  • University of LodzPoland
  • SAP AG (SAP)Germany
  • Planet S.A.Greece
  • Urzad Miasta Lodzi (URZAD MIASTA LODZI)Poland

Coordinating organisations outside the University of Münster

  • SAP AG (SAP)Germany

Projects of the following funding period

Duration: 01/07/2010 - 30/06/2011
Funded by: DZ Bank Foundation
Type of project: Individual project

Publications of the University of Münster resulting from the project

Becker J, Pfeiffer D, Räckers M, Fuchs P (2007)
In:  (eds.), 1-14(kein Verlag angegeben).
Research article in edited proceedings (conference) | Peer reviewed | Published
Becker J, Pfeiffer D, Räckers M (2007)
In: Eder, J.; Tomassen, S.L.; Opdahl, A.L.; Sindre, G. (eds.), Proceedings of the 19th International Conference on Advanced Information Systems Engineering (CAiSE 2007) Forum45-48(kein Verlag angegeben).
Research article in edited proceedings (conference) | Peer reviewed | Published
Becker J, Algermissen L, Falk T, Pfeiffer D, Fuchs P (2006)
In:  (eds.), 860-875(kein Verlag angegeben).
Research article in edited proceedings (conference) | Peer reviewed | Published
Becker J, Algermissen L, Pfeiffer D, Räckers M (2007)
In: Wirtschaftsinformatik49(4)267-279. doi:10.1007/s11576-007-0063-0
Research article (journal) | Peer reviewed | Published
Becker J, Algermissen L, Räckers M, Pfeiffer D (2007)
In: Erich Schweighofer, Anton Geist, Gisela Heindl (eds.), 10 Jahre IRIS: Bilanz und Ausblick: Tagungsband des 10. Internationalen Rechtsinformatik-Symposions IRIS 2007189-196StuttgartRichard Boorberg Verlag.
Research article (book contribution) | Peer reviewed | Published
Show all publications (19)

Doctorates resulting from the project

Domänenspezifisches Prozessmanagement – Konzeption und Evaluation einer Prozessmodellierungs- und -analysemethode für die öffentliche Verwaltung
Candidate: Räckers, Michael | Supervisors: Becker, Jörg; Müller-Funk, Ulrich
Period of time: 01/05/2006 - 13/01/2010
Doctoral examination procedure finished at: Doctoral examination procedure at University of Münster
Analysis of Semantic Business Process Models - Techniques Supporting Business Process Improvement and Compliance Checking
Candidate: Bergener, Philipp | Supervisors: Becker, Jörg
Period of time: 01/08/2007 - 29/01/2013
Doctoral examination procedure finished at: Doctoral examination procedure at University of Münster